Numbers, not claims.

Real projects. Actual outcomes. We do not publish estimates as results.

From ₹38L to ₹9L annual electricity bill.

1.2 MWp rooftop solar + 500 kWh LFP battery storage commissioned for a mid-size auto-components manufacturer. DG dependency eliminated. System sized for 87% self-consumption. Payback: 4.8 years at commissioning tariff.

Capacity

1.2 MWp Solar + 500 kWh Storage

Annual generation

15.6 lakh kWh

Cost reduction

76% reduction in electricity bill

DG eliminated

Yes — complete

Payback

4.8 years

Solar EPCBattery StorageManufacturing

23% reduction in common-area energy costs.

320 kWp rooftop solar installation across a 1.4 lakh sq.ft. mixed-use commercial development. Integrated with the building management system for demand optimisation. Net metering agreement secured with MSEDCL.

Capacity

320 kWp Solar

Annual generation

4.2 lakh kWh

Cost reduction

23% on common area bills

Net metering

Active

Payback

5.6 years

Solar EPCBMS IntegrationCommercial

Building your own case study.

Start with an energy assessment. Understand your current position and the financial case for transition before any capital commitment.